Film
Phased reconstruction firstborn Siberian metallurgy. (1986)

Film-document №40661 2 parts, Duration: 0:17:05 to collection Price category G
Title image

Part 1 digitized in HD 0:08:49

Availability of videosources


1, 2;

2 1

Show links for downloading

Producer Sverdlovsk newsreel studio

Director: M.Geller

Script writers: Komarovsky

Operators: Kochusov

Composers: Suslov

Annotation

The film describes the restoration of the Guryev Metallurgic Works.

Reel №1

Footage frameFootage frameFootage frameFootage frame

Landscape.

The city of Guryev.

E.J. Klassen (synchronously).

The head of the rolling shop A.M.Vorobey (synchronously).

Photos of the workshops of the plant before reconstruction.

B.V. Ivanov (synchronously).

Rolling shop.

Design bureau.

Drawings.

Works on the reconstruction of the plant (photos).

Rolling mill.

New buildings of the plant (photo).

Finished products.

Personnel

Klassen
Ivanov

Locations

Guryev

Objects

Guryev Metallurgical Plant

Industry
Sectors of the economy

Reel №2

Footage frameFootage frameFootage frameFootage frame

Ball rolling complex.

E.J.Klassen-Director of the Guryev plant (synchronously).

The old foundry building, built in 1846 (photo).

Reconstruction works (photo).

Taking a metal sample.

Pouring metal into the bucket.

Coking conveyor.

Foundry shop.

Meeting with the director (synchronously).

Hardware shop.

Rolling shop.

General view of the Guryev Metallurgical Plant.

Locations

Kemerovo region

Objects

Guryev Metallurgical Plant

Industry
Sectors of the economy