Film
Safety in the construction of subways in a closed way. (1973)

Film-document №75617 2 parts, Duration: 0:20:03 to collection Price category G
Title image

Part 1 digitized in HD 0:10:07

Availability of videosources


1, 2;

1 2

Show links for downloading

Producer LSDF

Director: G.Afanasjev

Script writers: M.Dobshic

Operators: G.Afanasjev

Annotation

An educational film on safety during the construction of the metro in a closed way

Reel №1

Footage frameFootage frameFootage frameFootage frame

Three young people come to the personnel department.

Graduates of vocational school came in the direction to get a job.

Conversation of graduates of vocational school from the beginning.

HR department (synchronously).

Together with the safety engineer, the guys go to inspect the objects.

Safety classes (synchronously).

Helmets, overalls, glasses, respirators.

The guys get acquainted with the head of the site and go with him to the site.

Having received and put on overalls and helmets, the guys go underground.

Drilling and blasting method of work.

Drilling.

The explosives get explosive materials.

One of the detonators gives a warning signal about the start of blasting.

A post at the entrance to the danger zone.

Cleaning the hole.

Laying explosive material in the hole.

Key words

Metro

Locations

Leningrad

Traction; Construction
Transportation; Sectors of the economy

Reel №2

Footage frameFootage frameFootage frameFootage frame

Explosive machine.

The bomber gives a second signal.

Explosion.

Sinkers strengthen the face.

Escalator tunnel.

Shield penetration.

The breed is on the conveyor.

Assembly of tunnel lining rings.

Disabling the starting devices in case of an emergency.

Key words

Metro

Locations

Leningrad

Traction; Construction
Transportation; Sectors of the economy