Film
Builders.. (1982)

Film-document №8681 2 parts, Duration: 0:15:30 to collection Price category C
Title image

Part 1 digitized in HD 0:09:29

Availability of videosources


1, 2;

1 2

Show links for downloading

Producer CSDF (RCSDF)

Director: Mikrikov A.

Script writers: Radovskiy D.

Operators: Semin V.

Text writers: Radovskiy D.

Annotation

About hydrobuilders, architects and builders of the Dniester Complex Hydro System, the Boguchansk Power Station at the Angara River and the cities Shevchenko, Navoi, Zarafshan and Baykal-Amur Railroad.

Construction

Sectors of the economy

Temporary description

Builders at work: at a construction site, a device for welding. Construction of hydropower; overlap Angara in the 50-ies. Construction Boguchanskaya HPP - blasting, meeting at the laying of the 1st concrete slab. Bratsk hydroelectric plant. Interviews architect MI Simonova in the streets of Leningrad, studio architect. Construction of the Baikal-Amur Railway. Classes at the school of arts.

Reel №1

Footage frameFootage frameFootage frameFootage frame

Bratsk hydroelectric plant - LS.

Cranes.

LEP - MS., PNRM.

The driver of the cab car - CU ..

PNRM.

Welder - CU.

Builders laid the rails - LS.

Construction of the hydroelectric complex on the Dniester - CU.

Worked as a welder - MS.

Builders said Brigadier I. Guzovaty (synchronous) - CU.

Builders, installers work - MS., LS., PNRM.

Newsreel 1956:

Overlap Sheds - LS., PNRM.

Builders rally - MS ..

PNRM.

The demonstrators applauded - MS.

Is a column of cars - LS.

Shimmering water flow - MS.

Boguchanskaya HPP construction - LS.

IB chief of construction Mikhailov - CU.

Blasting operations - LS.

Excavate - CU.

Construction of a house in a working village Kodinsky - CU.

Mikhailov talks with builders - CU.

Working crane - LS., PNRM. panel

Hydrobuilders rally to mark the laying of new cubic meters of concrete in the dam - LS., PNRM.

At the rally, advocates Mikhailov (synchronous) - CU.

Applaud builders - MS.

Bratsk hydroelectric plant - LS., PNRM.

LEP - CU.

Hydro turbine hall - CU., PNRM.

Bratsk Aluminum Plant - LS., PNRM.

Shop factory - LS.

Working at the stove - CU., PNRM.

Bratsk Timber Processing Complex - MS., LS., PNRM.

Leningrad - MS.

Nevsky Prospect - MS.

Architect, head of one of the architectural and planning workshops NI Simonov draws - CU.

Picture of - CU., PNRM.

Simonov and other architects in the studio to discuss the project - LS.

City layout - MS.

Navoi, reporting on city streets - MS.

Sculpture - CU.

Says architect Simonov (synchronous) in the studio - CU.

The sculptures in the studio - CU.

In the streets of the city of Navoi are people - MS., Shot through the fountain

Reel №2

Footage frameFootage frameFootage frameFootage frame

Section of BAM - LS., Filmed from a helicopter

There is a train - LS.

The engineer in the train cabin - CU., PNRM. on track

Ridges - CU., PNRM.

Severobaikalsk, homes - CU., MS.

Go down the street newlyweds - MS.

Classes at the School of Art, depicts a girl - CU.

Dancing children - LS.

Laying of track, foreman builders Bondar directs construction - CU., MS.

Construction of a bridge over the river Vitim - LS., PNRM.

Sinker working in the tunnel - MS.

Car leaves the tunnel - LS.

Bondar says (synchronously) - CU.

Rails - LS.

Spruce branch on a background of water - MS.

Team members in the Cooper Basin, fishing, dine at the table - LS., MS.

Hand, pours soup - CU.

Hand delivers a plate of fish - CU.

Cabin windows are sanctified in snowy taiga - LS.

Powered tracklayers - LS.

BAM builders pass from the team Cooper - LS., PNRM.

City at BAM - LS., Filmed from a helicopter

Line BAM - LS., Filmed from a helicopter